Gate Pass
RGP vs NRGP: A Practical Guide to Material Gate Passes for Indian Plants
By VizTrak Team · 24 November 2026 · 10 min read
Every plant has one. A 15 kW motor that went out for rewinding "for two weeks" and has not been seen in fourteen months. The returnable gate pass is somewhere in a carbon-copy book in the security cabin, the vendor has changed his phone number, and the maintenance engineer who signed it left in March. Nobody noticed until the auditor asked.
Material gate passes look like a small piece of paperwork. In practice they sit where security, stores, maintenance, purchase and accounts all meet, and a gap in any one of them costs real money. This guide explains how returnable and non-returnable gate passes work, where GST comes into it, what a good format looks like and how to stop RGPs from quietly going overdue.
The short version
An RGP covers material that must come back. An NRGP covers material that leaves for good.
A gate pass is an internal control. It does not replace a delivery challan, a tax invoice or an e-way bill.
Goods sent to a job worker must return within one year (inputs) or three years (capital goods), or GST becomes payable.
Most RGP losses come from passes nobody follows up after the material leaves the gate.
A weekly review of open and overdue RGPs fixes most of the problem, with or without software.
What a material gate pass actually does
A gate pass is the security team's permission to let material leave the premises. The guard at the gate checks that what is on the vehicle matches what is written on the pass, that someone with authority has approved it, and records the time it went out.
That sounds simple, but the pass is also the only link between the material and the people responsible for it. Stores needs it to update stock. Maintenance needs it to know when a spare is coming back. Accounts needs it for GST reporting. Purchase needs it to chase the vendor. When the pass is a slip of paper in a book at the gate, none of those people can see it.
RGP and NRGP compared
The difference comes down to one question: is the material expected to come back?
RGP (returnable)NRGP (non-returnable)PurposeMaterial leaves temporarily and must come backMaterial leaves permanentlyTypical examplesMotor for rewinding, gauge for calibration, parts for job work, tools lent to a contractor, demo unitScrap sold to a dealer, rejected goods returned to a vendor, empty packaging, free samplesExpected return dateRequiredNot applicableStatus after gate-outOpen until received back and closedClosed at gate-outFollow-upReminders, overdue tracking, partial returnsUsually none, beyond matching to the invoice or debit noteUsual GST documentDelivery challan (job work, repair and other non-supply movement)Tax invoice or debit note, depending on the transactionMain riskMaterial never comes back, or comes back shortMaterial leaves without proper sale or approval
Some plants add a third type for material moving between their own units. Treat that carefully. If the two units are in different states, they are separate registrations under GST, and the movement usually needs a tax invoice, not just a gate pass.
When to use which pass
Common RGP situations
Repair and rewinding: motors, pumps, gearboxes and PCBs sent to an outside workshop.
Calibration: gauges, weighing scales and test instruments sent to an accredited lab.
Job work: castings sent for machining, parts sent for plating or heat treatment.
Testing and trials: samples sent to a customer or a lab and expected back.
Tools and equipment lent out: welding sets, scaffolding or fixtures taken by a contractor for site work.
Demonstrations and exhibitions: a machine or product taken to a trade show.
Common NRGP situations
Scrap and waste sold to an authorised dealer.
Rejected raw material returned to the supplier.
Free samples and promotional material.
Empty drums, pallets and crates going back to a vendor who does not refund them.
Assets disposed of after write-off.
A simple rule of thumb for security and stores: if anyone in the plant would be unhappy never seeing the item again, it is an RGP.
Where gate passes meet GST
This is where most confusion sits. The gate pass is your internal document. GST has its own documents for goods that move, and the two need to agree.
Delivery challan
When goods move without a sale, for job work or for reasons other than supply, Rule 55 of the CGST Rules allows a delivery challan in place of an invoice. It needs a serial number, date, consignor and consignee details with GSTIN, HSN code, description, quantity and value. It is usually made in three copies, marked for the consignee, the transporter and the consignor. Your RGP should record the challan number so the two can be matched later.
Job work time limits
Under Section 143 of the CGST Act, inputs sent to a job worker must come back within one year, and capital goods within three years. If they do not, the law treats them as supplied on the day they left, and the challan becomes the invoice for that supply. Tax is then payable, with interest. Moulds and dies, jigs and fixtures, and tools are exempt from these limits (ClearTax).
This is the strongest reason to track RGP due dates properly. A job work RGP that drifts past twelve months is no longer just an operations problem. It is a tax liability.
ITC-04 reporting
Principals report goods sent to and received from job workers in Form ITC-04. Since October 2021, businesses with turnover above ₹5 crore file it half-yearly, and others file it annually. The challan details in that return should tie back to your RGP records.
E-way bills
Movement for reasons other than supply generally needs an e-way bill once the consignment crosses ₹50,000, though intra-state limits differ by state. For goods sent to a job worker in another state, the principal must generate an e-way bill whatever the value (TaxGuru). The e-way bill number belongs on the gate pass too, so security can check it before the vehicle leaves.
In practice: one outward movement can carry three numbers, the gate pass, the delivery challan and the e-way bill. Recording all three on the pass saves hours at audit time.
What a good RGP and NRGP format contains
Whether you use a printed book or software, these are the fields worth capturing. Fields marked as return details apply to RGPs only.
SectionFieldsPass detailsPass number, date, type (RGP or NRGP), department, requested byApprovalApproved by, designation, date and time of approvalPartyVendor or job worker name, address, GSTINMaterialItem code, description, HSN, quantity and unit, approximate value, asset or serial number where relevantPurposeRepair, calibration, job work, trial, demo, scrap sale, return to vendorReturn planExpected return date (RGP only)DocumentsDelivery challan or invoice number, e-way bill numberTransportVehicle number, transporter, driver name and mobileSecurityChecked by, gate-out time, remarks on any mismatchReturn detailsDate received, quantity received, condition, GRN number, closed by
One caution on driver details. A driver's name and mobile number are personal data under India's DPDP Act, so collect only what you need and set a retention period, as we explained in our guide to DPDP and your visitor register.
Where paper RGP books go wrong
Most plants already have an RGP process. The trouble is what happens after the material leaves.
Nobody owns the follow-up. Security issues the pass, but the due date lives in a book that maintenance and purchase never see.
Partial returns get lost. Ten castings go out, eight come back, and the pass is ticked as closed.
Approvals happen by phone. "Sir has said okay" is written on the pass, and there is no way to check it later.
Passes are not linked to challans. At year end, accounts cannot match ITC-04 entries to what actually left the gate.
Books go missing. One lost carbon book can mean a year of open RGPs that nobody can prove were ever returned.
A practical RGP process
The six stages of a returnable gate pass
Raise: the requesting department fills in the pass with item, quantity, value, purpose and expected return date.
Approve: the department head approves, with a second approval for high-value items or long return periods. Stores confirms the item and its asset or stock code.
Gate-out: security checks the material, the vehicle and the challan and e-way bill numbers against the approved pass, then records the time.
Track: the owner gets a reminder before the due date. Overdue passes go to the department head, then the plant head.
Receive and inspect: security logs the material back in, and stores or quality checks quantity and condition before accepting it.
Close: the pass is closed only when everything is back, or the balance is formally written off or converted to a sale.
Add one habit on top: a 15-minute weekly review of every open RGP, sorted by days overdue and by value. That single meeting catches most problems before the auditor does.
Numbers worth watching
Open RGPs by department and by vendor.
Overdue RGPs past 30 and 90 days.
Value at risk, the total value of material out on overdue passes.
Job work items nearing one year, so accounts can act before the GST deadline.
Average turnaround by vendor, which tells purchase which repair shops to keep.
Where VizTrak fits
VizTrak's gate pass management moves RGPs and NRGPs off paper and into the same system your security team already uses for visitors. Passes are raised and approved digitally, security sees the approved pass at the gate, and open returnables stay visible to the people who own them until they are closed.
Because it runs alongside visitor, contractor and vehicle entry, the gate becomes one checkpoint instead of three separate books. For plants with several locations, multi-location management gives head office one view of open passes across sites, and tracking and reporting turns the weekly overdue review into a report rather than a search through carbon copies. VizTrak runs on your own servers or as SaaS, and it is priced per location with no limit on users.
See how it works for factories on our manufacturing page, or check what it connects to on the integrations page.
Frequently asked questions
What is the difference between RGP and NRGP?
An RGP (returnable gate pass) is issued when material leaves the premises and is expected to come back, such as a motor sent for rewinding or an instrument sent for calibration. An NRGP (non-returnable gate pass) is issued when material leaves for good, such as scrap sold to a dealer or rejected goods returned to a vendor. An RGP stays open until the material is received back and the pass is closed.
Is a gate pass the same as a delivery challan?
No. A gate pass is an internal control document that lets security release material from the premises. A delivery challan under Rule 55 of the CGST Rules is a tax document that travels with goods moved without an invoice, for example for job work. Most plants issue both, and the gate pass should record the challan number.
How long can goods stay with a job worker under GST?
Under Section 143 of the CGST Act, inputs must come back within one year and capital goods within three years. If they do not, the goods are treated as supplied on the day they were sent, and tax becomes payable. Moulds and dies, jigs and fixtures, and tools are exempt from these time limits.
Do we need an e-way bill for material sent on RGP?
Often, yes. Movement for reasons other than supply generally needs an e-way bill when the consignment value crosses Rs 50,000, and intra-state limits vary by state. For goods sent to a job worker in another state, the principal must generate an e-way bill whatever the value. Check the current rules for your states with your tax adviser.
Who should approve a returnable gate pass?
Usually the head of the department that owns the material, such as maintenance for a motor or quality for an instrument, with stores confirming the item and its value. High-value or long-duration RGPs often need a second approval from the plant head or finance. Security should only release material against an approved pass.
What should we do about overdue RGPs?
Review open RGPs every week, sorted by how long they are overdue and by value. Chase the vendor in writing, escalate items past 30 and 90 days, and flag job work items approaching the one-year GST limit to accounts early. Close passes only after the goods are physically received and checked.
This article is a practical guide, not tax or legal advice. GST rules and e-way bill limits change, so confirm the treatment of specific movements with your tax adviser.
Take your RGP book off paper
Book a 20-minute demo and we will show you digital RGP and NRGP passes, gate checks and overdue tracking on a setup that matches your plant.

